The GDU-2000 plant is designed to remove residues of casting ceramic cores from the inner surfaces of parts after casting using a hydrodynamic method.
Unit composition:
1. Working chamber with a door
2. Light
3. Control panel
4. Sedimentation tank
5. Pump station
6. Electrical cabinet
1. Working chamber with a door.
The working chamber is made of stainless steel. Sound-absorbing material is laid between the inner walls of the chamber and the outer casing sheets. The left side wall of the chamber is equipped with a door through which fixtures with parts are loaded.
2. Light.
A light is installed on top of the roof of the chamber to illuminate the working area of the chamber, and there is also an exhaust pipe for connection to the ventilation system. For visual observation of the process, viewing windows are provided in the front wall of the chamber and in the door. An electrical cabinet is fixed on the rear wall of the chamber.
3. Control panel.
The control panel of the unit is located on the left wall of the chamber.
4. Sedimentation tank.
The settling tank is a welded container with three cascade trays installed one above the other. The lower part of the settling tank has a branch pipe for draining water into the sewer, the tank is equipped with a lid.
5. Pumping station.
The pumping station consists of a three-plunger horizontal high-pressure pump, a booster pump, a filter system and pipeline fittings.
The pumping station is a stationary unit as part of the product.
6. Electrical cabinet.
An electrical cabinet is mounted on the rear wall of the chamber, in which the electrical elements are located.